Maintenance of CFE Cogeneration Plant.

Cuautla Morelos.

This work tower was built for the maintenance and rehabilitation of three chimneys at the thermoelectric power plant in Cuernavaca, Morelos. This project was completed with Andamios Multifuncional Cimbramex. Se habilitaron zonas de trabajo en el perímetro de cada chimenea, con anchos de 1.20 m. logrando alcanzar una altura de 44 m de estructura, con niveles de trabajo a cada 2 m, brindando un acceso confiable y seguro para el personal operario.

Todos los proyectos

Central de cogeneración de CFE

Arched roof of soft drink plant

Silo construction

Fortress expansion 3000

Anahuac Auditorium

Puente papaloapan

Todos los cursos

Multidirectional scaffolding assembly and safety

Safety of working at heights

Use of Personal Protective Equipment for Industry

Handling the dismantling of rosette or multi-functional Cimbramex scaffolding

NOM-03-STPS-2011 Construction - Safety and health conditions at work

Riesgos y factores de riesgos ​

Practica de montaje y desmontaje andamios Cimbramex​

Armado y seguridad de andamio convencional ​

Armado, instalación y uso de Cimbra MK-2"CIMBRAMEX"​

Armado, instalación y uso de Cimbra Universal"CIMBRAMEX"

Diseño y cálculo de cimbras metálicas para la construcción​

Armado, instalación y uso de Cimbra MK-2 trepante "CIMBRAMEX"​