Maintenance of Arch Roof at Soft Drink Plant
León, Guanajuato
Multi-Functional System (Directional or Rosette)
This bridge was designed and assembled by in-house personnel for a soft drink company (Leon, Guanajuato plant). Designed using multifunctional scaffolding, it has a length of 73 linear meters, a walkway width of 1.20 meters, and supports every 10 meters. The structure was erected and launched 1 meter above the arched roof structure. It connects to a 15-meter-high stair tower for high-traffic personnel, providing safe and reliable access while meeting safety and quality standards.