Multi-functional system assembly service for the plant expansion. Fortaleza 3000 Plant Expansion - Phase 2

2ND STAGE Tula, Hidalgo

The client required a solution for steel reinforcement, formwork placement, and pouring of various structural elements, such as columns, beams, and slabs, in the different buildings of the plant expansion project. The Multi-Functional System was used in a special case to support a large, heavy concrete element called a HOROMILL. This element was supported by hydraulic jacks while simultaneously being poured and supported by our Multi-Functional System. This was required for two very similar buildings: two cement mills and a raw material mill. Additionally, the assembly of staircases was needed to access the elevated elements, such as the cement silos and the preheater, at a height of 110 meters. With CIMBRAMEX's experience in solving these types of projects with our scaffolding and formwork systems, a complete kit was supplied, offering the safety, cost-effectiveness, and versatility that characterize our systems.

Todos los proyectos

Central de cogeneración de CFE

Arched roof of soft drink plant

Silo construction

Fortress expansion 3000

Anahuac Auditorium

Puente papaloapan

Todos los cursos

Multidirectional scaffolding assembly and safety

Safety of working at heights

Use of Personal Protective Equipment for Industry

Handling the dismantling of rosette or multi-functional Cimbramex scaffolding

NOM-03-STPS-2011 Construction - Safety and health conditions at work

Riesgos y factores de riesgos ​

Practica de montaje y desmontaje andamios Cimbramex​

Armado y seguridad de andamio convencional ​

Armado, instalación y uso de Cimbra MK-2"CIMBRAMEX"​

Armado, instalación y uso de Cimbra Universal"CIMBRAMEX"

Diseño y cálculo de cimbras metálicas para la construcción​

Armado, instalación y uso de Cimbra MK-2 trepante "CIMBRAMEX"​